Food Processing Industry Solution

Resource Utilization | Reduction

In food processing industry, coconut shells, nutshells, coffee husks, and sugarcane bagasse are common biomass waste. Accumulation, burning, and landfilling solutions may cause carbon dioxide emissions, fire hazards. As an expert in waste recycling industry, Beston Group provides pyrolysis solutions for recycling these biowastes.

Biowaste Accumulation

Biowaste Burning

Biowaste Landfill

Overview Of Charcoal Machine

01

Coconut Shell Feeding

Input coconut shell with a size less than 20mm and 20% moisture content into the drying furnace.

02

Coconut Shell Drying

After drying, the moisture content of the coconut shell reaches about 15%.

03

Combustible Gas Collection

Collect combustible gas to provide heat source for the machine.

04

Coconut Charcoal Collection

Coconut Shell charcoal is collected through the out put system.

Note: Here is an example of recycling coconut shells as recycling bio waste.

Circular Biowaste Recycling Solution We Offer

  • Biowaste to charcoal

    Pyrolysis solution can process biomass waste from plantations and food processing into charcoal.

  • Charcoal for food processing industry

    Charcoal can also be used as fertilizer for plantations and alternative fuel for food processing industry.

It is an excellent circular solution. It can maximize your returns while minimizing environmental impact.

Click To Find Specific Solutions

Coconut Shell to
Charcoal/Biochar
Nutshell Shell to
Charcoal/Biochar
Coffee Shell to
Charcoal/Biochar
Bagasse Sugarcane
to Charcoal/Biochar

What Equipment Can We Offer?

BST-50 Model Biochar Charcoal Production Line
BST-06Quicker Model Biochar Charcoal Production Line
BST-50 Model Biochar Charcoal Production Line

BST-50 Continuous Biochar/Charcoal Machine

Vetted by Puro.earth, Rainbow, pre-approved by Isometric
6,000 tons biochar production annually
7200H/Y stable & safe operation

BST-06Quicker Model Biochar Charcoal Production Line

BST-06Quicker Continuous Biochar/Charcoal Machine

Vetted by Rainbow
8-hour rapid installation and deployment
Movable design allowing 8-hour disassembly and reassembly

Ready to Work Together?

Don’t hesitate to come for consultation with your requirements. Our solid waste recycling experts can help you find the most comprehensive configuration. We’re ready to work with you, how about you?

    INQUIRY GUIDE

    Please specify your requirements including:

    • 1. Solution DemandWhat specific technical challenges should we solve?

    • 2. End Product InfoDetails on your raw materials and end product application.

    • 3. Timeline & BudgetProject start date and machinery investment range.

    • 4. Customization FocusSpecial points you want our consultants to prioritize.

    Get a Custom Quote

    Submit your requirements and our project managers will provide a customized solution for your project.

    PROJECT DETAILS

    CONTACT INFORMATION

    Beston BST-50/BST-06Quicker Have Been Vetted By Rainbow. Learn More
    x