Tire Pyrolysis Project in Africa

Tire Pyrolysis Project in Africa– Turning Tires into High-Value Oil & Carbon Black

1. Challenges Faced Tire accumulation: The customer’s region has accumulated a large number of waste tires that are not being fully utilized. Low product value: Conventional disposal methods generate low-grade carbon black (selling at only 1.5–1.8 USD/KG) with narrow applications and weak market demand. 2. Goals for Change To enhance … Read more

Coconut Shell Charcoal Machine in Indonesia

Indonesia Coconut Shell Recycling Project – Meets Market Demand for Shisha Charcoal

1. Project Background & Challenge The client, based in Indonesia, has been engaged in the production and sale of coconut shell charcoal for many years. Previously, the company relied on traditional production methods, which led to inconsistent charcoal quality, low efficiency, and limited output. These are making it difficult to … Read more

South Africa Plastic and Tyres Pyrolysis Project

Plastic/Tyres Pyrolysis Project in South Africa – Turning Waste into Energy

1. Project Background & Challenges A metal smelting plant in South Africa faced two pressing challenges in its operations: Accumulation of non-recyclable waste: The plant generated large volumes of plastic and rubber waste that could not be treated through conventional recycling methods. The mounting piles created increased disposal costs and … Read more

Oman Oil Sludge Harmless Pyrolysis Treatment Project

Oman Oil Sludge Pyrolysis Harmless Treatment Project – Ensures Environmental Compliance

1. Challenges Faced The Oman customer, Elite International, is committed to oil sludge treatment. Historically, the industry relied on relatively basic disposal methods to control costs. With the tightening of environmental regulations, however, such approaches no longer meet compliance standards and carry potential hefty fines and reputational risks. To safeguard … Read more

UAE Biochar Production Project

UAE Biochar Project – Converting Waste into Desert Soil Solutions

1. Project Background & Challenges The UAE is struggling with severe land degradation, where desertification continues to limit soil fertility and agricultural productivity. At the same time, large amounts of agricultural residues such as date palm leaves and trunks remain underutilized, often disposed of as waste. Against this backdrop, the … Read more

Biochar Production Equipment Installation Site in the United States

U.S. Biochar Carbon Removal Project – Driving Carbon Neutrality

As the world faces growing climate challenges, carbon removal technologies are gaining importance. In the U.S., the demand for sustainable solutions continues to rise. This case study highlights how Beston Group partners with U.S. customer to implement biochar production for large-scale carbon removal. 1. Challenges Faced Carbon emissions are worsening … Read more

Tyre Pyrolysis Project in Nigeria

Tyre Pyrolysis Project in Nigeria – Add Value to Waste Tyres

1. Challenges Faced The client is a Nigerian company specializing in waste recycling and faced growing pressure to manage the increasing volume of end-of-life tires. These non-biodegradable materials not only created environmental and storage issues, but also represented a missed economic opportunity. The core challenge was to transform this waste … Read more

3 Sets of BLJ-16 Plastic Pyrolysis Plant in Finland

Finland Large-Scale Plastic Pyrolysis Project – Reduces Plastic Waste Export Dependency

1. Challenges Faced Since 2018, China has implemented a “foreign waste” import ban, which includes plastic waste. Many developed countries in Europe and North America can no longer rely on exporting their plastic waste as they once did. They are now forced to confront and resolve their environmental burdens. This … Read more

Oil Sludge Pyrolysis Project Launched in Hubei China

Oil Sludge Pyrolysis Project in Hubei China – Promotes Coal Tar Processing and Trading

1. Challenges Faced The Chinese customer (Hubei) is primarily engaged in oil sludge recycling. However, a key challenge restricting their business expansion was the lack of Environmental Impact Assessment (EIA) approval. This prevents them from legally engaging in the coal tar processing and trading business. 2. Goals for Change To … Read more

Beston Engineer with Morocco Customer

BLJ-16 Pyrolysis Project in Morocco Significantly Reduces Client’s Fuel Cost

On March 21, 2025, we shared an update on the installation and commissioning of the pyrolysis project in Morocco. As of now, the project has entered a stable operational phase and continues to deliver value to the customer. Read on for key outcome achieved: 👍 Outcome Achieved LDPE plastic: 6 … Read more

    Please specify your requirement by referring to the following aspects:

    1-What kind of solution will meet your demand? (Key point)

    2-What kind of end product are you planning to have? (Right solution begins from material and product)

    3-When is the project supposed to be running?

    4-Budget for machinery purchasing? (Key info for right model)

    5-Do you need EPC services, including factory planning, design, construction, equipment installation, etc.?

    6-Points that you really focus on. (Customized service from project consultant)