BTF1-4 Egg Tray Making Machine Shipped to Ghana in July 2022

Good news! Beston BTF1-4 small egg tray making machine was shipped to Ghana in July 2022. Beston Group has finished the production and delivery as planned. Here are the images, video and some introduction on the machine to Ghana.

BTF1-4 Egg Tray Making Machine Shipped to Ghana in July 2022
BTF1-4 Egg Tray Making Machine Shipped to Ghana in July 2022

Introduction of Small Egg Tray Machine to Ghana

Model: BTF1-4;

Capacity: 1500pcs/h;

Raw material: waste paper;

Required end product: paper egg tray of 30 holes (5*6);

Drying method: natural drying in the sun;

Mold: plastic molds provided with the machine.

Mold
Mold
Manufacturer
Manufacturer
Electric control cabinet
Electric Control Cabinet

FAQs of BTF1-4 Egg Tray Making Machine to Ghana

Q: How did the customer in Ghana get in touch with Beston?

A: Customer in Ghana wanted to buy a set of egg tray manufacturing machine, and he searched for the machine on Google. Later, he found that Beston Group ranked NO.1 in Chinese pulp molding industry. He was quite interested and left his info on the site. Our project manager contacted him in shortest.

Q: Why did the Ghana customer want to buy the egg tray equipment?

A: He was planing to buy the machine to produce paper egg trays, and then sell the trays to farms or supermarkets for making money. The paper egg trays have high quality and can well protect the eggs during transportation or storage.

Q: How did the customer comment on Beston Group?

A: The Ghana customer was quite satisfied with Beston Group, no matter the product or the service. He has thanked Beston Group again and again for the suitable solution. Both of us are feeling good when cooperating with each other.

 

Shipment of Manual Egg Tray Making Machine to Ghana

The whole production of the machine has taken 10 days. The following is the video of Beston BTF1-4 manual egg tray making machine to Ghana. All the goods have bee checked before the shipment. The goods will be shipped out by sea from Tianjin port. We are looking forward to receiving the goods and start running the machine soon.

    Please specify your requirement by referring to the following aspects:

    1-What kind of solution will meet your demand? (Key point)

    2-What kind of material and expected end product are you planning to have? (Right solution begins from material and product)

    3-When is the project supposed to be running? (Key info for A-Z project programming)

    4-Budget for machinery purchasing? (Key info for right model)

    5-Points that you really focus on. (Customized service from our project consultant)

    CONTACT US

    Please Feel Free To Give Your Inquiry In The Form Below.

    Your Message (required):