Company News

Beston Group Becomes Technology Provider for Puro.earth


We are excited to announce that Beston Group has entered into a technical partnership with puro.earth, the world’s leading crediting platform for engineered carbon removal. We have officially become a vetted technology provider for puro.earth. This partnership means that recyclers will be able to participate in international carbon credit trading through Beston’s BST-50S biochar production equipment. This is a sign that Beston Group’s leading position in carbon removal technology has been recognized globally.

Technical Excellence: Passing Puro.earth 7 Assessments

According to puro.earth’s “Biochar Technology Supplier Evaluation Criteria (2022 Edition)”, Beston Group biochar production equipment excels in the following seven key areas:

01 Complete Combustion Guarantee

The equipment combines a dual combustion chamber design with flue gas recirculation technology. This ensures that the pyrolysis gas is fully burned and the temperature and residence time meet the standards.

02 Ultra-low Pollutant Emissions

The equipment uses an integrated exhaust gas treatment system (heat exchanger, bag filter, desulfurization tower, activated carbon filtration, etc.). After testing, the emission data meets EU standards.

03 Waste Safety Management

The whole process quantitatively manages solid waste, including ash, tar, etc., and liquid waste. This ensures that the project operates in compliance with regulations.

04 Air Pollutant Emission Testing

Based on the test data of eucalyptus wood chip raw materials, the equipment emissions meet environmental regulations. This provides a reliable reference for global customers.

05 Greenhouse Gas Control

Equipment testing shows that CH₄ emissions during operation are less than 0.1% of the carbon fixation of biochar. In addition, N₂O emissions are less than 1%. This provides a reliable basis for carbon footprint accounting.

06 Biochar Quality Certification

The H/Corg ratio of the biochar produced by the equipment is <0.7. Therefore, its durability meets the EBC (European Biochar Certification) limit and meets the soil application standards.

07 Equipment Service Life

The tar and dust self-cleaning system ensures that the equipment operation time reaches 7200 hours/year. This provides long-term stability for the project.

Value Creation: Helping Achieve Sustainable Profits

Efficient Equipment Supply

BST-50S biochar production technology of Beston Group is strictly vetted by puro.earth. This ensures that the produced biochar meets the international carbon removal credit (CORCs) standards. Customers can apply for the carbon credit vetting of puro.earth with Beston BST-50S.

Compliance Operation Guarantee

puro.earth conducts regular audits on projects using Beston biochar pyrolysis equipment. It verifies waste treatment, emission compliance and biochar quality. Thus, this ensures the project meets international standards in long term. The third-party supervision mechanism reduces operational risks for carbon removal projects.

One-stop Service Support

We provide customers with full-process support from equipment delivery to technical training. At the same time, the cooperation between Beston Group and puro.earth simplifies carbon credit vetting process. Therefore, this helps customers achieve carbon removal goals efficiently and maximize benefits.

Future Layout: Deepen Technology Iteration

Zeo Zhang, head of Beston Group’s marketing department, said: “As a solution provider, Beston Group’s mission is to provide customers with efficient and reliable biochar production equipment. This cooperation with puro.earth helps recyclers transform pyrolysis technology into sustainable commercial value.” In the future, Beston Group looks forward to working with global customers to promote the larger-scale application of carbon removal technology. If you need a customized solution, please contact us.

    CONTACT US

    Please Feel Free To Give Your Inquiry In The Form Below.

    Please specify your requirement by referring to the following aspects:

    1-What kind of solution will meet your demand? (Key point)

    2-What kind of end product are you planning to have? (Right solution begins from material and product)

    3-When is the project supposed to be running?

    4-Budget for machinery purchasing? (Key info for right model)

    5-Do you need EPC services, including park planning, design, construction, and operational support, etc.?

    6-Points that you really focus on. (Customized service from our project consultant)


    Your Message (required):

  • Contact Us
    X Contact Us

      The senior project manager will contact you within 24 hours. Please check your email inbox in time.