“All the Beston and how are you?
Welcome to our plant that we have finished. And this is the six ton a day pyrolysis plant. Come on.
All right, form this side we have got our gas burners and heavy oil burners.They are all on tracks and and they are working absolutely perfect to pushing in and out. And the gas burners all connect them in. Further down this way, we have got our water cools…water cools spiral for a moving sludge. And see what. On this side our spirally…the horizontal spiral. The gas across into the manifold. For the other side. Yeah we connected our manifold with the heavy oil tank on the bottom which will treat nicely we have got emergency exit up the top for gas and for pressure. And we have got our five across in to the 3 in 1 condensing unit. We have put a small flash guard on the side which is to original drawings just stop water from falling to outside, which was quite nicely. Through on this way. We have got our oil store section. These water tanks are to separate the water from the oil and from the pump into the big oil store tanks. We have got 50 thousand Liters of each storages for the oil that we can pump out to customers as we need.And from this side. This is our 40m3 water storage for cooling the exhaust pipe outside.
And that engineer is working together online very nicely and thank you very much for all of your support and your help (from Beston).”
In 2019, our Zimbabwean customer, Eric came all the way from Zimbabwe to visit the headquarters of Beston Group company and the production base of the Beston factory. After listening to Beston’s technical solution explanation and visiting the factory’s production process, the customer spoke highly of Beston, expressed their willingness to cooperate on the spot, and was full of confidence in the future in-depth cooperation.
After receiving the customer’s order, Beston factory has arranged the production as soon as possible. This is a standard set of BLJ-6 batch tire pyrolysis equipment. During the production process, we have dedicated staff to send the production progress every week to the customers in Zimbabwe, so that the customer can grasp the information in time.
All the production work is done in front of the node. Before delivery, we arranged for the customer to conduct an on-site inspection. After confirming that the customer was very satisfied, we arranged the shipment. All the goods were packed and sent to the nearest port for being shipped to Zimbabwe.
Before the goods arrived in Zimbabwe, our engineers have already sent the preparations to our customers. Therefore, as soon as the goods arrived at the customer’s side, our customer has told us that we could start the installation work immediately. Due to the epidemic, we arranged for professional engineers to conduct online installation guidance and debugging. Everything was going well.
With the efforts of both parties, the overall operation of the project has been very successful. We have also received feedback on the final products from our customers. All the customers were very satisfied with the output and quality of the final products.
Beston is committed to helping every customer succeed and helping them realize
the value and meaning of the projects! Beston is always here to serve you!